A roofing bill of materials from an XML report lists the materials a roof needs, based on measurements the report already contains. Roofing estimators often receive these reports from measurement providers. The report holds the facets, pitches, and areas. The estimator then rebuilds those numbers into a list of shingles, underlayment, drip edge, and fasteners. That rebuilding step is where errors creep in, and it takes time on every job.
What is in a measurement report?
Measurement providers deliver roof data in several formats. An XML report is structured, which means software can read each field without guessing. A typical report includes the roof outline, the number and shape of roof facets, the pitch of each facet, and the area of each section. Some reports also list edges, such as eaves, rakes, ridges, and valleys, with their lengths.
Structured data is useful because it can be converted directly into quantities. A person reading a PDF has to copy numbers by hand. Software reading XML can carry the numbers straight into a calculation.
How does an XML report become a bill of materials?
The conversion has three steps. First, the software reads the measurements from the report. Second, it applies the material rules the estimator uses, such as waste factors and coverage per bundle. Third, it outputs a list of items with quantities. The estimator checks the list, adjusts it for the job, and uses it to order materials.
Artemis Atlas does this for uploaded reports: upload a provider XML report, and it returns a bill of materials. The output is a starting point for the estimator, not a final order.
What should an estimator check before ordering?
A bill of materials is only as accurate as the inputs and rules behind it. Before an order goes out, review the following:
- Facet areas that look too large or too small for the house
- Pitch values that do not match the photos or notes from the site
- Waste factors suited to the roof shape, since hips and valleys need more material
- Items that the job does not need, such as a trim type not used on this roof
A short review catches most errors. The value of the report is that the numbers start in one place, so the review is a check and not a rebuild.
Does a consistent format help the crew?
It does. When every estimate uses the same output format, the crew learns to read it quickly. Suppliers also handle a consistent list faster. Keep the bill of materials with the job file, so changes are recorded and nobody works from an old version.
Where does a bill of materials fit in the estimate?
The bill of materials sits between measurement and pricing. Measurement gives the quantities. The bill of materials turns quantities into items. Pricing then attaches a cost to each item. Teams that separate these steps can change one without rebuilding the others. If a supplier changes a price, the list does not need to change. If a report is corrected, the pricing can be updated from the new list.
Turn an XML report into a bill of materials
Artemis Atlas returns the public parcel boundary and building footprint for an address. It also accepts a provider XML report, and returns a bill of materials from it. It offers a REST API and MCP for teams that want to connect the output to other systems. You can learn more at Artemis Atlas. For a conversation about how this would fit your estimating process, reach out to Market Standard.